VW and Audi Load 6 Cars into 53ft Containers

Jan 2010

VW and Audi load 6 vehicles into the new 53ft CMT Containers in their Chinese operations moving vehicles from Tainjin to Shanghai.

VW and Audi load first car into container

Preparation to load VWs and Audis into container

Preparing the T-RAK

1st VW car loading into container

Raising VW in container

Securing the T-RAK

Checking lashings are secure

Moving second VW into place

Third VW being loaded

Fifth VW loaded, ready to be raised

6th and final VW loaded into container